Project - Excavation and Concrete Breaking to Provide Surface Access to Tunnel Network

Excavation and concrete breaking in a confined space creating a shaft up to 20 meters below ground using a Brokk 90 and an operative with confined space training. By using different attachments with the Brokk 90 the operative was able to break and then excavate using the same machine. MTFs fleet of Brokk machines which includes fully powered electric versions are ideal where air and noise pollution would make working conditions impractical.